shortshort
Short 2 of 3No captions34.5 seconds

Fixing the Village Flooding Problem

Cut from Opening a Brand-New School · Anamol Saru · published today · 0 views

The short

0 views

1080 × 1920 · 34.5 secondsDownload MP4

Jimmy highlights an undersized river culvert that routinely submerges the local road and replaces it with massive industrial pipes to keep the crossing safe.

Selected by AISubject tracked · 58 keyframes
  • 1. Complete arc showing the dangerous flooding hazard, the excavation and replacement with giant pipes, and students crossing safely in the rain.

The original · 19:02

2:232:57 · the passage this short was cut from

Only the passage this short was cut from plays here.

The marked passages are the moments cut into shorts. The one you are watching is drawn in ink.

Transcript

No transcript has been added to this edit.

2:232:57 · 0 words · highlighted words are emphasized in the short