Building a School and Fixing a Flooded Bridge · part 5 of 7
The short
1080 × 1920 · 86.1 seconds
The original
1:16 → 3:08 of 19:02Each mark is a moment cut into a short. Select one to jump to it; the short you are watching is drawn in ink.
7 shorts from this video
10:18 kept out of 19:02- 1Building a School and Fixing a Flooded Bridge · part 1 of 71:13 → 3:08 · 89 s
- 2Bringing Clean Water and Solar Power to a City · part 2 of 74:10 → 5:40 · 90 s
- 3Surprising a Local Teacher with His Dream Home10:09 → 15:52 · 90 s
- 4Building a School and Fixing a Flooded Bridge · part 4 of 71:13 → 3:08 · 89 s
- 5Building a School and Fixing a Flooded Bridge · part 5 of 71:16 → 3:08 · 86 sPLAYING
- 6Bringing Clean Water and Solar Power to a City · part 6 of 74:11 → 5:40 · 89 s
- 7Building a School and Fixing a Flooded Bridge · part 7 of 71:16 → 3:08 · 86 s
MrBeast reveals why his team is constructing a brand-new school to help children escape illegal cocoa farm labor, and overcomes severe village flooding by replacing a narrow pipe with massive drainage culverts.
- 1. MrBeast raises the first wall of the new school and tours the overcrowded, flood-prone building currently holding over 300 children.
- 2. Torrential rain cuts off access between the community and the new school site, prompting the crew to install two large concrete drainage pipes to permanently fix the crossing.
Transcript
We built this school because here's the one that they currently go to. How many kids go to school in here? 325. 325 in this one building? Yes Oh my gosh. When it is raining the place gets flooded so because of that the children don't come. The kids have to travel miles sit in dirty classrooms and learn in sweltering heat. When the kids are in school they're no longer working on cocoa farms which is why higher attendance means less child labor. The school we're building is gonna change though as you can see. The rain here gets so bad that the flooding would prevent kids from even getting to the school we're building To my right is the village we're building To my left is the rest of the community. In between the two is this river that has to flow through this pipe but because this pipe is so narrow the water can't flow through it so it gets backed up and floods the surrounding areas completely separating the two communities. The current tunnel to stop flooding is three feet wide and their new water drain is four feet across and we built two of them. I'm doing everything I can to stop the flooding After two long weeks of working in the rain we finally fixed this bridge and this village is not flooding anymore. We are very very happy because it is going to help us smooth movements to the school every day. And now that thankfully flooding won't be an issue let's head back over to the school. Nolan act like this isn't your first village you built Well one of over a hundred in this school. This is literally gonna take weeks.
1:16 → 3:08 · 290 words · highlighted words are emphasized in the short
More in Creators
See all Creator videos- Racing Across 3 Extreme Biomes for $100,000Shared by Habi J. · 23:27 · 4 shorts
- Copper Hair TransformationShared by Ibrahim E. · 1:38 · 1 short
- Messaging 50 Celebrities: The 100-Day Challenge ResponseShared by Yassir · 7:32 · 1 short
More shorts
Browse the community- Desperate Interrogation Room Attack BackfiresShared by Waseem S. · 63.6 seconds · from an 18:51 video
- Teacher's Magic Trick with CandlesShared by MrsLitvaka · 29.7 seconds · from a 2:51 video
- How the Plague Reshaped Medieval SocietyShared by Dimon F. · 23.3 seconds · from a 4:37 video
- Muttukunnanu - Sita Ramam Iconic Romance SceneShared by ytapitest H. · 28.9 seconds · from a 4:06 video
- Kaanunna Kalyanam - Sita RamamShared by ytapitest H. · 43 seconds · from a 3:26 video
- Chasing the Final SquadShared by Bhanu G. · 23.9 seconds · from a 10:18 video